Back from OZ

We got back from Australia after a weekend away and heaps has been done. The roof is finished and all the guttering is on, bar the drainpipes. Most of the windows are now in, and the plumber has done the pipes to the shower and basin in the ensuite and the bath is nearly in. George lay in it last night (in the guest bathroom).





The soffits are nearly all done and the weather boards are on. George has run the network and telephone cables, and speaker cables for the fancy Apple TV system he has designed.

Looks pretty cool huh. Not even two months after the builders started.

We have just realised today that it will really only be a matter of weeks before we are in. We are really looking forward to the bricks going up. We have double glazing so lovely wide window sills.